Tunnel Excavation analysis using PLAXIS2D

  • Bids0
  • Budget $0.00
  • Average Bid $0.00

Posted on

Active
Bid

Project Desciption

Tunnel Excavation analysis using

I need 10 page of this assignment completed. In 2009, a residential canal was proposed at the Pimpama Riverside Development and geotechnical investigation was performed to assess the geotechnical settings of the area. The results of this investigation include a map (Figure 1), a series of boreholes logs (Appendix 1), soil properties (Appendix 2) and material for structures (Appendix 3).

Employer Information

2100 project(s) posted hire 2 freelancers
Member since: 2020-02-01
FREELANCER BIDDING (0)

There are no bids yet.

Open chat
1
Whatapp Us
Hey? You want your project done, Whatsapp us Now.
Click to Submit a Project